    Foundation solated / Combined Footings.
    Structure R.C.C. Framed Structure.
    Walls 6" & 4.5" thick brick Masonry in Cement Mortar
    Plastering Single Sponge finish for both External and Internal Walls.
    Flooring Vitrified tiles flooring in rooms, Balcony & Corridor Anti skid Ceramic Tiles.
    Doors Main door : frame and doors teak wood polished. Other doors wood frame with flush doors, for Toilet PVC doors
    Windows UPVC shutters, with mosquito net and M.S. Grills.
    Toilets Ceramic Tiles in Toilets upto 6'0" height dado & Kitchen 2'0" height dado for walls. C.P. Fittings of ISI Quality.
    Sanitary Western commodes of Parryware or equivalent make with wash basin and provision for geyser in each bath room.
    Painting Internal alteak for all walls. Emulsion paint for all walls and ceiling. External front Elevation wallcare, remaining three sides emulsion paints.
    Kitchen Platform Granite platform & Steel sink.
    Water supply Bore water continuous supply from over head water tank.
    Electricity Copper wiring with concealed conduits for sufficient Electrical points in all rooms. Provision for A/c Points in bedrooms.
    Parking One Car Parking for flat in stilt floor.
    Lift 3 Lifts of Johnson or equivalent make for 6 Persons each lift.
    Generator Backup 3 ligts, 3 Fans in each Flat and For all Lift, Corridor and other Common Areas.